EPC rules landlords need to know: what to check for an HMO
EPC band E is the law today; band C by 2030 is a proposal. What the rules say, which exemptions exist and an order of work for HMO owners, as of 29 October 2026.
Published9 min read

On this page
If you own an HMO, the EPC question tends to come up at licence renewal or when a headline about 2030 lands. The headlines blur what is law today with what the government has proposed.
This guide sets out the EPC rules landlords must follow in England and Wales as of 29 October 2026, separates them from the proposals, and gives an order of work for an HMO. It is not legal or tax advice. For your own property, check with a solicitor, an accountant or your local council.
What are the EPC rules landlords must follow for a rented HMO today?
The minimum is EPC band E. GOV.UK’s landlord guidance, last updated on 5 May 2026, says that since 1 April 2020 “landlords can no longer let or continue to let properties covered by the MEES Regulations if they have an EPC rating below E, unless they have a valid exemption in place.”
MEES stands for minimum energy efficiency standard. It comes from The Energy Efficiency (Private Rented Property) (England and Wales) Regulations 2015, which legislation.gov.uk shows with no known outstanding changes at the time of writing. They cover domestic properties let on an assured, regulated or domestic agricultural tenancy that are legally required to have an EPC. How your own room agreements fit that description is a legal question, so ask a solicitor or the council’s private sector housing team.
There is a cost cap. You are not currently required to spend more than £3,500, including value added tax, on improvements. If you can’t reach band E for that, you make the improvements you can up to the cap and then register an exemption. If third-party funding, such as a local authority grant, covers the full cost of reaching E, the cap doesn’t apply. Improvements you made since 1 October 2017 count towards the cap.
Does an HMO need an EPC, and for which part of it?
The building needs one, not each room. GOV.UK’s guide to EPCs for let dwellings says an individual room doesn’t need its own certificate, because a room isn’t a building or a unit designed for separate use. The whole building needs one when it is rented out.
An EPC lasts 10 years, or until a newer one is produced. An accredited domestic energy assessor has to produce it, and the person who becomes the tenant must receive a copy free of charge. Adverts have to show the rating where there is one.
Councils can add their own expectations. Cherwell District Council’s HMO licensing policy says there is “currently no legal requirement for HMO landlords to produce an Energy Performance Certificate (EPC) for each dwelling”. It adds that where a property has no current EPC it will put a condition on the licence to obtain one, and that where the rating is below C it will seek improvements to C, or to the greatest improvement the property can reach. If your HMO is in that district, the practical bar at licensing can be higher than E. Our HMO licensing guide for Oxfordshire landlords covers the wider process.
Will the EPC C standard be compulsory by 2030?
Not yet. As of 29 October 2026, a higher standard similar to EPC C is a government proposal and not law. In its response of 21 January 2026, the Department for Energy Security and Net Zero confirmed its policy decisions, and said “the legislative changes set out in this document will be subject to Parliamentary approval”.
The response aims for regulations to come into force in 2027, and says “the intention is that landlords will need to comply with the amended PRS Regulations from 1 October 2030”. The GOV.UK landlord guidance, which still describes band E and the £3,500 cap, was last updated on 5 May 2026. Treat the 2030 standard as a planning assumption, not a deadline you can be fined for today. The proposed test is also not a simple band C check: it would use new EPC metrics, with a fabric performance standard plus either a smart readiness or a heating system standard, chosen by the landlord.
| Item | Law today | Government proposal (21 January 2026) |
|---|---|---|
| Minimum rating | EPC band E | A new standard on new EPC metrics (fabric performance, plus smart readiness or heating system), described as similar to EPC C |
| Date | In force for all lettings since 1 April 2020 | From 1 October 2030 |
| Spending cap | £3,500 including value added tax | £10,000 per property |
| Exemption length | Mostly 5 years | 10 years for the cost cap exemption and some others |
| Maximum fine | £5,000 per property in total | £30,000 per property per breach |
Under the proposals, a home that holds an EPC of C or above on the current scale before 1 October 2029 would count as compliant until that certificate expires. The government’s impact assessment estimates an average spend of £5,400 per property, with the cap included. That is an estimate for a proposal, so don’t treat it as a quote.
Which exemptions can a landlord register?
Today there are six, and you must register them on the PRS Exemptions Register with evidence, because an exemption only applies from the point you register it. Most last 5 years.
The all relevant improvements made exemption applies when you have spent up to the cap, or nothing further can be done, and the property is still below E. The high cost exemption applies when even the cheapest recommended measure would cost more than the cap, and needs three quotes. The wall insulation exemption applies where the only relevant improvements are wall insulation and you hold written expert advice that they would harm the fabric or structure of the building. The third-party consent exemption covers a refusal from a tenant, freeholder or planning authority, and for a tenant’s refusal it lasts until that tenancy ends. The devaluation exemption needs a surveyor’s report that the work would cut the value by more than 5%. A new landlord can claim a 6-month exemption.
The proposals would add or reshape some of these, including a cost cap exemption, a solid wall insulation exemption and a property value adjustment where the cap is £10,000 or 10% of the home’s value, whichever is lower. None of that applies yet.
What should you check, and in what order?
Start with the certificate, then price every recommended measure, then sequence the work. Records of what you spent and when matter, because improvements count towards the cap.
- Find the EPC on the national register. Check the rating, the date (10 years) and that it covers the whole building.
- If there is none, commission one from an accredited domestic energy assessor before you advertise a room.
- If the rating is F or G, improve it to E or register an exemption before a new letting, or straight away if the building is already let. If the building is empty and you aren’t planning to let it, you don’t need to act until you decide to.
- Read the recommendations. GOV.UK says the ratings after each improvement are cumulative and assume the measures go in in the order listed.
- Get written quotes for each recommended measure. Costs vary widely, so price low-cost items such as draught proofing and hot water cylinder insulation alongside bigger works like wall insulation, glazing and heating. Keep every invoice and date.
- Check funding, such as grants and the Boiler Upgrade Scheme, and confirm each scheme is still open. The January 2026 response says the Energy Company Obligation (ECO4) ends in 2026.
- Plan access. Work in an occupied HMO needs notice and cooperation, so schedule it between residents where you can, and keep copies of any refusal, because they support a third-party consent exemption. Good relations with residents help here, and our Renters’ Rights Act checklist for HMO landlords covers what has changed for landlords since 1 May 2026.
- Diary the EPC expiry, any exemption end date and your licence renewal.
A management partner can keep the EPC, the works schedule and the licence dates in one place, but it is not an energy contractor, so ask who pays for upgrade work and whether EPC assessment or retrofit is part of the service. The B-Hive Living landlord page lists “proactive maintenance” and technology and automation among its stated reasons to work with it, and says it offers a range of management models. It doesn’t list EPC assessment or retrofit as a service. Our questions to ask a coliving operator are a useful starting list.

What do energy upgrades mean for bills if rent includes them?
If your rent includes energy, an upgrade lowers your own costs, so the saving comes to you. If tenants pay their own bills, it goes to them. The government’s response says landlords who don’t pay the bills have little reason to act, which is part of why it wants a standard.
An EPC rates the building on standard occupancy, not on how many people live in it. A full HMO can use much more energy than the certificate suggests, so check any measure against your own meter readings and bills, not only the certificate. Cherwell’s HMO standards are strict on heating too: space heaters must be fixed, and prepayment meters that control shared supplies are not accepted in licensed HMOs.
The response also says government will publish guidance on whether energy efficiency spending on a rented property counts as an allowable expense or is tax-deductible. Until then, take advice from an accountant before you assume anything.
Frequently asked questions
Can I let a property with an EPC rating of F or G?
Only with a valid exemption on the PRS Exemptions Register. If the property is empty and you don’t plan to let it, you needn’t act until you decide to let it again. Check the current guidance on GOV.UK before relying on an exemption.
How long is an EPC valid?
Ten years, or until a newer certificate for the same building replaces it. You can reuse it for every letting in that period.
What happens if I let a property below band E?
The local authority enforces the rules. It can serve a compliance notice, and a penalty of up to £2,000 for a breach lasting under three months or up to £4,000 for three months or more, with publication of the breach. The total maximum is £5,000 per property. The government proposes a higher limit of £30,000 per breach, which is not yet law.
How much will it cost to meet the proposed standard?
Nobody can say without an assessment of your building. The government estimates an average of £5,400 per property under its proposal and proposes a £10,000 cap. Get an assessor’s recommendations and written quotes.
Do I need a new EPC if mine is already band C?
Under the proposals, a C or above on the current scale issued before 1 October 2029 would count as compliant until it expires. That rule is not law yet, so keep the certificate and check GOV.UK for updates.
Find out what B-Hive Living offers private owners
If you want to see what B-Hive Living says it offers private owners for maintenance and management, start with the B-Hive Living landlord page.
Sources
- Domestic private rented property: minimum energy efficiency standard - landlord guidance - GOV.UK GOV.UK (Department for Energy Security and Net Zero), checked October 2026
- Improving the energy performance of privately rented homes: government response (HTML) - GOV.UK GOV.UK (Department for Energy Security and Net Zero), checked October 2026
- A guide to Energy Performance Certificates for the marketing, sale and let of dwellings - GOV.UK GOV.UK (Ministry of Housing, checked October 2026
- The Energy Efficiency (Private Rented Property) (England and Wales) Regulations 2015 legislation.gov.uk (The National Archives), checked October 2026
- HMO Licensing Policy 2024 Cherwell District Council, checked October 2026
- Houses in multiple occupation | Cherwell District Council checked October 2026


